Site Preparation |
Clearing, grading, and prepping land for construction. |
$2.50 – $6.00 per sq. ft. |
Trenching |
Utility trenches for water, gas, electrical, and drainage. |
$8 – $22 per linear foot |
Foundation Excavation |
Digging for residential or commercial foundations. |
$1,500 – $5,000 per project |
Basement Excavation |
Full basement digs including soil haul-off. |
$10,000 – $25,000+ |
Driveway & Road Prep |
Grading and leveling for driveways, roads, and parking areas. |
$1.50 – $4.00 per sq. ft. |
Land Grading |
Slope correction, drainage management, erosion control. |
$1,000 – $6,000+ per project |
Pool Excavation |
Digging for in-ground swimming pools. |
$3,000 – $12,000+ |
Demolition & Removal |
Concrete, asphalt, and small structure removal with haul-off. |
$4 – $12 per sq. ft. |
Septic System Install |
Excavation for septic tanks and drain fields. |
$3,000 – $10,000+ |
General Hourly Work |
Hourly excavation with operator & equipment. |
$125 – $250 per hour |